Skip to main content

Expertise

The expertise that has been built by constructing, operating and performing research at the HADES underground research laboratory over the past decades is extensive, to say the least. Discover our many strengths here.

  • Connection roadheader

    Constructing HADES

    HADES was constructed in two major phases, from the early eighties until the excavation of the PRACLAY gallery in 2007. 

    lleeaarrnn  mmoorree

  • clay pieces

    Clay behaviour

    Decades of research, development and demonstration (RD&D) in HADES have given rise to important insights in the behaviour of Boom Clay.

    lleeaarrnn  mmoorree

  • instrumentation borehole

    Instrumentation and monitoring

    Ever since the installation of the first experiments, we have world-renowned expertise in instrumentation and monitoring. This allows us to keep track of what's happening in situ.

    lleeaarrnn  mmoorree

  • supercontainer

    Engineered barriers

    In and around HADES, many experiments and demonstration tests have been and still are conducted on engineered barriers that could potentially be used in a real geological repository.

    lleeaarrnn  mmoorree